Tag Archive for construction and repair

Perform Aerial Work

Preparation of forest and scaffolding to perform work at height is of great importance both for the safety of high altitude, and for the safety of others. Therefore, preparations for the implementation of the work at height is carried out mainly engineer organization very carefully, allegedly an act of acceptance of forests. Scaffolding height: more than 4m allowed the commission to design the act of acceptance; Up to 4m are allowed after acceptance by the head (master) works with the recording in the Journal of acceptance and inspection of forest. Gary Kelly may find this interesting as well. Verified: 1. linkages and fasteners for strength and stability, 2. good working decks and fences, 3.

uprights 4. reliability of support sites; 5. an earth. Curvature of the struts permitted no more than 1,5 mm per 1m length. Before the crime to carry out work at height of the forest every day, with a break in service after exposure to extreme weather conditions or weather conditions, which adversely affect the integrity of the forest should be inspected by the manager or foreman of works, that is logged receipt and inspection of forest.

As a result of the inspection shall be established: the presence or absence of defects, strength and stability, the presence of barriers, the availability of forests in the future. Daily, and under certain high-altitude work leaves a lot of rubbish – as the accumulation of the winter snow and ice must be to clean floors and staircases. Assembly and disassembly of forests is carried out only on the plan of works subject to a sequence of workers who were specially instructed, failing to foreign territory. Only if all the conditions of high-altitude work will be qualitative, and security is guaranteed.