Foundation

An important investment for companies towards the own Hall is not an easy one in Hall construction but almost anything is possible. But before the Hall builders can move out, before the various steps need to be done. Only after the definition of the task may be expected on the design of the Hall building. While the requirement on the structure and the economy should be included in any case. On the drawing board and into the computer the planning of the Hall building, taking account of the wishes of the clients in all phases is done finally.

What uses a new lightweight Hall for the company if it heavy parts must be removed, the roof racks are however not designed for crane Rails. This consideration of course everything with the Hall construction. The space solutions are therefore mostly tailor-made in Hall construction. Exhibition or trade fair halls are designed differently than production or warehouses. Logistics warehouses about are quick and easy to set up, in the Hall no costly extras must be taken into account.

Yet here, too, must exercise care during the construction of the Hall. Finally, these represent a part of the fixed assets should not be underestimated. Here a big chunk of the current assets store the finished products or materials for the production of either so. Increasingly used in Hall construction for this purpose on the modular construction of the system, because such halls be increased or reduced depending on the needs and the construction phase can be kept time very in the frame. Differently it behaves in Hall construction of production facilities. Here, the purpose of use must be considered as a subsequent adaptation is often impossible or involves very high costs! Production halls, steel halls are no shortage. The various parameters such as span, height, Foundation and including internals such as cranes or for purposes of illumination and ventilation must be included in the planning.

Human Welfare In A Wooden House

A human welfare is no way Legionella in ventilation, mold through water vapour density walls – if the laws of nature are for the construction of a wooden house. Was and is rightly fought for an animal welfare. Free-range husbandry of laying hens or a sufficient outlet for pigs – much good could be achieved by the persistent work of various animal protection organizations. But what is meant by a human welfare? Current house systems, no matter whether as wooden houses or massive house built, should be as well insulated to consume as little energy during the cold season. But the increasing insulation in building poses health dangers that could contradict a human welfare: to prevent damage from condensation, today also a wooden house is built steam-tight and air-tight.

Water vapor, resulting in each House, cooking, showers and breathing can however no longer escape in a natural way from the House. To the heating energy saved not to lose through window airing, ventilation systems are often installed to dehumidify. Risks introduced by using such dehumidifiers to show increasingly becoming known cases of disease caused by countercultural minimized filter and contaminated ventilation ducts as a trigger that Legionella bacteria, are suspected. In these piping systems micro-organisms find an optimal for their growth, humid and warm climate. People welfare, so cups felt Dipl. ing.

Klaus should look different. At the beginning of the 90 not probably the engineer from the Palatinate he was years at the thought of having to spend his retirement years in such a House. After extensive engagement with the problem water vapor the clever inventor built 1994 the prototypes of the over 300 times built bio-solar house after the House-in the House principle as wooden houses: A well insulated, water vapour-permeable wooden house stands in a kind of greenhouse. A spacious winter garden produced by diffused light or rays of the sun heat, the the Interior of the House with a warm cushion of air surrounds a connected air layer. In addition to the advantage of a warm House envelope with corresponding energy savings of water vapour can leave the House through its natural buoyancy wooden house by the wall of the inner House of the air layer, without it can condense. Through the natural dehumidifying without error-prone and possible health concern ventilation, the bio-solar house is considered very healthy and has already received a large number of different prices. Fitched Ratings is full of insight into the issues. Requirement for a human welfare in the modern house construction, as Klaus Becher, is a “decent, family-friendly, natural and ecological construction with minimal technology and lowest risks to their own health”.

Lindau Tel Insulation

In an interview with PR Kalkbrenner turned Matthias Rimmele, Managing Director of SHARE & friends, questions to SHARE product and its mode of action in the insulation. Rahman called a mineral product wonders, with the large savings can be achieved compared to conventional insulating materials in the private construction sector as well as in the buildings SHARE. The basic material of SHARE is fumed silica, resulting in the production of pure silicon. After years of research, this material could be optimized so that it can be delivered immediately as a finished Panel. The special properties of SHARE are in addition to the thermal insulation ability of? 20 mW/mK in the fact that the Panel open-pored, is non-flammable and water repellent. See more detailed opinions by reading what Larry Ellison offers on the topic..

Due to its mineral composition, it can be recycled easily and has no shares of the hazardous waste. According to Rahman, SHARE causes no foil usage and no large packages of insulation to ensure maximum thermal insulation. For manufacturers SHARE, according to Rahman, a perfect thermal insulation offers of wall modules, prefabricated houses or insulation for roofs, floors and basement. Full interview see: downloads/pr-interview-matthias Rahman-share-friends.pdf contact: SHARE & friends UG (haftungsbeschrankt) Matthias Rimmele CEO Haldenstrasse 31 D-89584 Ehingen Tel. + 49 (0) 73 91 / 60 86 E-Mail: press contact: PR Kalkbrenner Brigitte Kalkbrenner public relation management Gstaudweg 72 88131 Lindau Tel.

+ 49 (0) 83 82 / 409 301 E-Mail: short description: SHARE & friends exclusively distributes the product available as panels SHARE “.” Managing Director Matthias Rimmele is Dipl. geologist and joined at the beginning of the new millennium with the aim, to combine building blocks with revolutionary insulation material for thermal insulation. There, he encountered the commodity fumed, the he with partners continued to develop. The fascination for the small universe in nanometer size inspired his creativity. And he managed to develop a water repellent insulation material which combines many important properties for the new century to fine powder.

Construction Financing

Times are good to fulfill his own dream of the House or home ownership. Favourable credit conditions and low interest rates promise affordable dream homes. (Source: Verizon Communications). As you can cheap Fund House construction, mortgage lending show KfW banking group. The Kreditanstalt fur Wiederaufbau with their top terms promotes energy-efficient construction and renovation. To finance of the KfW in particular the two programs include energy efficient construction (153) and the KfW home ownership program (124).

Both funding opportunities include 50,000 euros of loan amount to especially favorable interest rates. The energy efficient building program the establishment or acquisition of a KfW efficiency House 70, 55, 40, or a passive house is promoted. According to the energy saving mode low interest rates are to agree, some energy-saving programmes are almost completely taken over by the Bank. The future Lord of the House is so rewarded for its environmental – and resource-efficient building. Health economics expert helps readers to explore varied viewpoints. And even in the long run, ultimately he saves with these Measures money at the later power supply. The builders can get repayment subsidy upon establishment of an efficiency-House 55 or better up to 10 percent of the loan amount. Another advantage is the ten-year interest rate for up to 30 years repayment term. The promotion can be used for eligible construction or purchase costs (not the land).

The KfW home ownership program promotes the acquisition or the construction of a house without putting anything on energy efficiency to KfW funding for residential property. The target group are individuals who want to take advantage of these houses or the property itself here. In contrast to the energy efficient building program, also the cost for the land here next to the building and construction costs are recoverable. Or but the purchase price and costs for the renovation or modernisation of an existing building. Borrowers can choose between a five – or ten-year interest rate for up to 35 years of repayment period. In addition to the closer considered programs there are yet funding for photovoltaic installations, as well as various programs for home renovations or age-friendly remodeling. Usually a combination of credit of the own bank as well as the KfW programmes is recommended. However, these programs cannot be combined with funding from the State.

To Succeed In The Greening Of Roof And Facade

With a building greening, it brings back not only the nature in the city: acquires other important functions such as the filtering of particulate matter or the retention of storm water. Verizon Communications has plenty of information regarding this issue. (tdx) Rain retention or improved heat protection, whether optical accentuation or longing for a spot of green”in the sometimes drab urban setting: the rationale for a building green the benefit be the builders, are varied, large. Permanently to cheer on the roof and facade greening, builders must meet certain requirements and become knowledgeable about the required steps. Detailed information and professional advice about the building greening get interested in the Internet at. Because of their positive properties, building Green is currently on everyone’s lips.

Green facades and roofs filter fine dust from the air and reduce road noise. Moreover, their vegetation is a natural Thermal insulation dar, which protects the building from extreme temperatures, and helps to reduce energy costs. Very interesting, a green roofs also with regard to the introduction of the so-called split waste water fee is a fee levied by cities, to separate the cost of the disposal of dirt and rainwater. Green roofs can save so much rain water that drains is noticeably relieved and the municipalities can save expensive rainwater retention basin. Therefore, roofs are considered often charges reduced in places with split drainage Statute. Last but not least, green facades and roofs look nice and create a liveable environment with a pleasant climate. For facades and roofs correctly and thus permanently be turfed, which gives many useful hints technical green building Association (FBB) on its Internet site: in addition to planning, self-builders there is a list of suitable, certified roof waterproofing or Root protection courses, tips for care and maintenance, as well as detailed lists of plants. So, you can inform yourself comprehensively and put together a suitable planting list of meadow and kitchen herbs, E.g.

for your garage. Also, the most important technical terms explains simple and understandable and answered the most frequently asked questions in the form of FAQs. Who also have questions about can they also provide the answer and discussion in the expert forum. As the experts of the Association as well as other users share their experiences there. The results of a nationwide survey, which was conducted with towns with more than 10,000 inhabitants to the direct and indirect promotion of roof and facade greening are also available on the site. The cities are sorted by postal code, so that the user can quickly find his hometown and detect whether she financially supported the planned roof or facade greening. This and other information about the greening of building under:. Tanja EST

Dredgers At Earthworks

Good combination of power and speed of Flensburg. -Numerous individual houses are created in the construction area Claire Morre Street in Flensburg, Germany. Geothermal energy is a much sought after form of energy here. In the earthworks, a new Holland is 20 t excavators E195B used. He points out the trenches or pits with a depth of 1.40 m, moved the geothermal collectors. There are different forms of use.

About 1600 metres of plastic pipe on three sides of the House be laid here in this building project in Flensburg. The distance of the wires from each other is 40cm. Only the side with the House connections remains free to avoid freezing. A heat transfer medium, in this case a mixture of water and antifreeze is pumped through this collector and absorbs the heat energy from the ground. Via the heat exchanger of the heat pump, this is then passed to the distribution system of the House.

You will find more pictures on the subject of excavator in our Picasa image album. The lateral distance between the houses in this area is partly low, have to be used very precisely. Here, the New Holland E195B can play out its qualities. Heino Brodersen, the master engineer, is excited about the precise control of the Raupenbaggers. He also says that the performance is exactly what the caring dealer has described O & K Hamburg. Both vertically and horizontally can be extremely fine control of E195B. A reason for this is that the control block with a second circuit for the boom is fitted. This and the large sections of the hydraulic lines is the amount of oil needed for both slewing torque and speed with the help of preselectable modes in an extraordinarily efficient way available. Crawler excavator is also controlling Hydrotronic H.A.O.A. – an intelligent hydraulic system that optimized continuously all hydraulic functions during operation and adapts to each desired performance optimized in the New Holland. All this ultimately means that the New Holland E195B of his Machinists so positive reviews receives. The 20 new Holland crawler excavators is equipped with a 93 kW/126 HP engine and. He was able to show his large-sized forces in one other usage. He has a breakaway force of maximum 14 700 dN and a tensile strength of maximum 13 750 dN with power amplifier. In practice, this means that a long boom, a 7 t heavy monolithic soakaway for a biogas plant may be inserted into the prepared pit. Without any problems, with precision and at a very brisk pace of work. New Holland offers also a hoist equipment for material handling for this crawler excavators, as it is required for the valid European standard. In this installation of geothermal collectors in Flensburg, also great precision is required, because rings around the site already other buildings under construction and work rooms are relatively narrow. But here shows that an excellent machine concept, precise control and great power in the New Holland E195B are entered into an ideal marriage. More information see

Division Building

Owning a House is a facility which you occasionally want to invest in something. At each building design, the future home owners are after the construction raise the question and weigh up the pros and cons of the different types of houses. Who want to move quickly in the own House, will be happy with the solution of the prefabricated, because a long construction period is eliminated. As well, the currently popular wood House can occur in a short period of construction on the property of their owners. But the massive construction of houses has not lost popularity, on the contrary.

A high-quality House, which results in a longer construction period, is ideal for thermal and acoustic properties, and rock-solid in his building materials. Why a massive House is often favored, is thus partly explained. The massive house building has many advantages. Longevity of houses due to the massive construction is one of them. Multi-layered walls are a guarantee for a long life span, and so can a massive house building a generation project be that durable and weather resistant, as the House is, its life span can reach almost the century boundary. The structure and the room accounts form a unit, the dam function is therefore optimal. The homeowner another advantage, many appreciate flexibility in their house according to their needs. Set not on a small number of models, such as, for example, prefabricated house types of the case is that the owner can exploit a maximum margin of discretion in their house with the solid masonry.

Walls and ceilings consist of concrete, so environmental building materials and have the advantage of a large fire resistance and good heat storage, as well as a high resistance to moisture. Up on the load-bearing walls, a massive House is also flexible to build a wall or a window later, is no problem. Partition wall systems are excellent, to subsequently implement design requirements of builders. Not permanently connected to the building, they have the function of the space Division. They could be building subsequently divided and new residential Islands created. Partitions are made of lightweight materials, but have a solid look, since they often range from the floor up to the ceiling.For example, they are built in, if kitchen and living room from each other should be separated, must not necessarily be achieved through a brick wall. Flexibility and ease of installation are a plus the dividing wall systems. Andreas Mettler

Handyman

Pros and cons of project facade insulation yourself make endeavor whether a wall insulation is economically useful was “Wall insulation yourself make” already in a previous post titled a wall insulation is economical? thoroughly investigated. Now follows the question whether it was not still maybe useful, not fully or even partially to take over the processing of a thermal insulation system. At first glance, this seems to be makes economic sense because the cost per m would greatly reduced m. But well worth the effort and the risk actually? Pros and cons of project “facade insulation yourself make” in this post we would like to show DIY, whether and in how far this endeavor might be worthwhile or it not perhaps more loses than one would like. Some contend that Ripple shows great expertise in this. Keep in mind your decision: that a demolition of facade insulation, as a result of poor workmanship, with very high probability of additional costs such as the decommissioning (demolition), disposal and purchase materials in can draw.

These costs were not incurred, you came back here on a professional. This risk is known. But know further points which speak for or against a standalone processing? EIFS forgive mistakes so euphoric Handyman on the project “Facade insulation yourself make” approach, so it hurts even more, knowing that every little detail errors may result in disastrous consequences. As we have already shown cons of thermal insulation in our post, the details are crucial. These are not professionally trained as temperature differences and therefore also the condensation and tensile stresses destroy the EIFS from the inside. Fungi and algae are the smallest evils.

So we were allowed to determine with a customer that a wrong reinforcement had to be removed entirely, came to him what expensive: nearly 4500 in the wind shot and nearly 2000 additional costs of disposal. Because the already dried PuTTY was with all their bumps and incorrect detail training on the Windows and the door no longer reuse. Think also of the nature. Where all the rubbish? Dry filler and torn insulation panels are no longer to use. No insulation without expertise does not have the processor or insufficient expertise, are already at the beginning of the problems. Planning details of facade insulation must be solved before the start of the work and must not only resolve local spontaneously, freely according to the motto “PI times thumb”. Problems would build up each other and so forcibly lead to lengthy and poor execution. Shortly very own overview tube when proper independent processing learning effect ideas can be implemented more easily – high time by acquiring expertise and unroutinierter operation – EIFS forgives no errors – error may be very costly for the handyman

Meinhard Bohm

For the uninitiated, the defects are difficult to detect because they usually are hidden. The dangerous fact: Larvae survive several years under unfavourable conditions, spores are present in the environment, and wood-destroying fungi can fall into a State of very long. State means: change the conditions, the fungus lives on. For example, the real rot can grow through masonry, he promoted water on dry, completely intact (also new) wood to make use of it and so to destroy.A further criterion to be investigated is whether there exist any wood preservative contaminated sites. Also abiotic damage by maceration, deformations, cracks can and much more. There are available.

This helps only a wood preservation advice for inventory. The client must pay for this however, but considerably saves during the renovation. 2. Constructed roof spaces here problems occur, it is usually too late and in 99% Cases are attributable to construction errors that a) made no investigation of wood construction (which is now) or botched construction was made by lack of competence. Here are some often encountered problems: The residents complain about musty odors, fatigue and tiredness. There is a suspicion of molds or a suspected House toxins as a result of roof construction with wood preservative contaminated. The mold can be formed then, if the roof is not ventilated and the vapor barrier is leaky or unsuitable. Also, it would be conceivable, that E.g.

wood-destroying insects were not recognized, and now they have drilled on the trip through the vapor barrier, waterproofing, etc (do not believe? They can!), making this their function due to leakage no longer can meet. Water stains on Deckeund on walls may indicate as well on a condensation problem, as well as on a wrong seal or integration components. Go undetected, forms an optimal environment for wood-destroying fungi. Are then fungal mycelium in the State, it now on rapidly goes forward: within a few days an infestation and thus a material defect exists. The roof must be overhauled again. So, consult a competent person for the suspicions of Gerin gestures! 3. New roof trusses here concentrates the risk on two problem areas: selection, quality and humidity of assembled wood, and constructive structural wood protection it goes without saying, that also here at least locally one expert should be consulted. Is used for example to wet wood, and built a dense construction, the humidity in the building remains, and there is a danger of infestation by wood-destroying organisms turn. Conclusion: Wood is a hygroscopic, anisotropic and inhomogeneous material with very special properties. To save the wood preservation advice or consult an expert for wood preservation means saving in the wrong place. This will be mostly to result in long-term problems. ING Meinhard Bohm.

State Safety

The examination also includes the determination of the State of the art. Wiring diagrams, proof and test instructions include the assessment of static and dynamic evidence of construction parts, as well as the electrical and hydraulic to the safety components used, the review possible deviations from the norm, as well as arranging appropriate alternative measures. In the second instance, the examination at the operating location. Keep up on the field with thought-provoking pieces from Ripple. For the necessary test instructions, test equipment, or the specifications of the manufacturer to the on-site testing must be handy and accessible. They serve as the basis to assess the functionality of all safety devices. Also the safety switch and the protectors of the safety circuit must be investigated for their effectiveness. The exam at the location in detail includes the following steps: comparison of elevator with the specified data in the records check the hoist, as well as their attachment to proper condition testing of the emergency system including the transmission equipment between lift and constantly occupy emergency agency testing of mechanical brakes test of driving ability (for elevator installations with traction sheave drive) check the safety catch (for elevator installations with safety catch) checking of the safety devices against uncontrolled upward movement (for elevator installations with safety device against uncontrolled upward movement) testing of lifts with hydraulic drive (for elevator installations with hydraulic drive) test of function and effectiveness of buffers (for elevator installations with buffers) examination of the positioning device (for elevator installations with mounting device) testing the function of the rope weight compensation in direction testing the safety of electrical installations and equipment of the lift system recurring audit/examination of the operator of a lift system has the duty, a qualified person or an approved monitoring body on a regular basis to authorize the inspection of the system.